View Single Post
Old 10-27-2005, 04:03 PM   #1
Ziroc
Ironworks Webmaster

     
     Bow to the Meow

 

Join Date: January 4, 2001
Location: Lakeland, Florida
Age: 52
Posts: 11,732
I *REALLY* hate to have to delay the release, because I wanted to go nuts this weekend and let you all enjoy the new stuff, but I have been finding some major errors in 2 tilesets that will require at LEAST 4 days of work, and I feel that if I rush it out, it'll be like all the other retail games out--full of bugs, and need patches.

I want to make damn sure the final product is 100% ready, and checked over. I don't want to rush it, you know? Being sick pushed me back a month. I'll have enough time to release it on Nov 11th, so hang in there, I know you don't want to download the hak, and find out it needs fixes and needs to be re-downloaded. that would suck, and these extra days will save you all that trouble [img]smile.gif[/img]

Sorry guys, I suck with release dates


The Hakpak will consist of the following files:

efu_tiles - All the tilesets
efu_2da - all the datafiles
efu_snds - Sounds/Music
efu_place - Monsters / Placeables / Icons / Armor & Weapons
efu_patch - empty file, for future updates

[ 11-10-2005, 07:45 AM: Message edited by: Ziroc ]
Ziroc is offline   Reply With Quote